Showing posts with label 2018 finish a long. Show all posts
Showing posts with label 2018 finish a long. Show all posts

Wednesday, September 19, 2018

4th Qurter coming up.

I missed the 3rd quarter Finish-A-Long but I'm still keeping track of what I've done and what has not been done.  I'm finding the 2018 Finish-A-Long very helpful in completing many of my UFOs or things that I've gathered material for but just store it and stare at it once in a while (yeah, you know you do that as well.....)   So what I thought was to share what's been done in the 3rd quarter and then list what I want to do in the next in another blog posting for October because that's when you list your next set of goals.  So, here we go....



(1)  The Midnight Garden. DONE  And my mother is absolutely crazy about it.  It's wool with  two and a half inch squares sewn all around the wool.  It's really very beautiful.  Here's what it looks like now before  (to your right and here is what it looks like completed:











(2)  The pixelated eye - which is a Craftsy free course online with Caro Sheridan.  I have the kit and I would like to complete it so I can exchange the pixelated quilt that is hanging right now (a pixelated sunflower I made after this course) can be changed.  But I only cut some of it, I didn't even do a stitch.  So this is going back on my list for October.


(3)  Wanted to make the 2nd door for the quilted barn door that I have started for my entrance way to my sewing room.  The pattern is from Jennny Pedigo and Helen Robinson for Sew Kind of Wonderful.  It's from a book called One Wonderful Curve. It's a fantastic book with beautiful patterns, all quilts have curves. And I got it done.  It looks wonderful and was perfect for the summer, to change the look of our dining area.  Take a look.  It's quilted with small leaves all over it.  I'm very pleased with the look.
(4)  I want to complete some Row-by-rows that I've been collecting for the last two years.  At one point I had 110 of them.  I've slowly but surely been going through some (I've done over 20) and I want to set a goal of four of them in this quarter of time.  I am hoping that in December I will have enough to make a queen/king size quilt for my bed.  I am also working at Quilting-as-you-go style for these rows.  I've made this goal.  I have quilted as I go 6 of them and made the following but two are not quilted.  So I guess I didn't make this goal.  Need to put it on my list for next quarter.



(5)  Another goal for this quarter is to do another quilt kit that I purchased.  It has old style quilting material that is made of diamonds.  You use 2 1/2 inch strips.  Perfect to make a fast quilt.  I started, made the triangles but haven't pieced them together so this is back on the list.  I don't even have a picture for this one. 

(6)  Flamingo Quilt by Elizabeth Hartman - I have been gathering up the pink material to complete the quilt.  The pattern is wonderful.  Here's someone else's quilt already done up.  I am starting from scratch - nothing is cut.  And still like that...  Definitely for the next barn door, and definitely on the list for the 4th quarter.

(6)  Deer Course on Craftsy - Under the same idea - Patch work Piecing:  Woodland Animals is a Craftsy course by Elizabeth Hartman.  I still want to make a pillow of it, or a smaller quilt.   If not the deer then the bear for a child's quilt.  After Sewology, this one will be a breeze.  But I'm going to be realistic and think a pillow since I want to make flamingo doors, and that will take a bit of time.  We'll see.


(7)  Still haven't touched Pat Sloans' 100 blocks.  I think I've lost a few in the move last year, need to keep on looking.  But I do have the shadow material to make the quilt.

(8)  I set a goal to keep up with the Sewology BOM that I am part of.  It's a wonderful quilt pattern by Pen and Paper Patterns on Craftsy.  I'm excited athat I only have the buttons section to complete.  All the others are done, and even pieced together.  When put together it's almost the right size for a queen size quilt (I've been adding spaces to some sections to help me make it bigger.  But I am confident that although not done for this quarter, it will be completed for Christmas.  Who's getting this quilt?  ME!!!  and I'm looking at entering it for our Guild's show in May.  It's the perfect entry.  I'm also looking at doing a secondary pattern for the back so I can flip it and use both sides.  One side the pattern shown and the other side four needs with thread.  It would look great together.  Can't wait..  

(9)  You and Me Quilt by Tres Chic.  IT's DONE!!!  And did it ever take so much time to do those 1/2 inch to 1 inch little squares all over it.  And you wonder why my machine needs to go in.  
Thinking this is enough?  Noooooooo.  There's more, and some urgent.

(10)  A table cloth for a friend of mine made by Northcott Fabric, their artisian line.  It's DONE!!!
Great backing as well
she's extactic about it.
(11)  A panel of a heron, that's from Artisian Fabric  Absolutely gorgeous.  Just doing it as a panel for a table top.  It's not done and it's on my next one.  Do love the look of it.  Making it into a table top for my aunt for her Christmas gift.  She'll love it.

12) This  Craftsy Quilting Class Quilt. wasn't even touched.  Still need to do it but it's top priority on this quarter's section because this one is definitely going into the quilt show as well.  The quilting on it will make everyone ooooo, and ahhhhh
WOW
three done now.

13)  My  Redwood Quilt (quilt that is completely made up of red material) is not done at all but the stitching is completed.   On  the list to complete.
and now


 14)  I joined a class for making a quilt called "In Full Bloom".  It's making a flower out of coloured fabric.and this one is done....  Beautiful and hanging on my wall.  DONE


15)  I have material for a pink top and the pattern.  Short sleeve, cotton top.  Want to complete it before July but never got around to that one.  Instead I completed this one, top and pants


16)  I also have pink material for a jumper dress that is perfect for this silk/polyester material that has a lot of embroidery but was too busy this summer to get to it.  I'm leaving it for next summer.

17)  The final sewing project I wanted to complete was a small knit top and shorts set for the summer but as before, I never got to it.  Was organizing my closet and that was more important.

OK, that's it, as you can see I had a goal of doing at least 5 out of the list and the total is.....  Drum roll:

I did five!!!!  And two of them queen sizes!!!  So as I said this really helps me to get things done.  I know I'm doing great.  Wait for the next quarter and....

JUST WATCH ME  :)


Monday, July 2, 2018

Continuation of the 2018 UFO Challenge for All People's Quilt

Another month has gone by and another number has been drawn for the 2018 UFO Challenge.  It's now #7.  And what quilt of mine is that one?  It's the triangles in old fashion material.  One that I purchased for my cousin Garrett and his family.  I don't have a picture of the finished product, just a roll of old fashion material (2 1/2 inch strips), and some white.  And a pattern.  So lets make this a little different, and I'll post when done.....

I still have the Missourri Quilt Company quilt to complete (number 11) I decided to do this one :



This one needs 1¾ yards dark solid fabric
1¾ yards light solid fabric
BINDING:  ¾ yard
BACKING:  3¼ yards - horizontal seam(s)
This one is smaller.

 But I am also trying to complete my #9 which is the table runner for a very good friend of mine, Anna.  So I'll try to do both this month as well as my UFO challenge and the #7 one.  Am I taking on too much???  You better believe it.  Here's an update of the challenge with pictures of what I have completed.  This month because I am flying out to Manitoba I am currently working on #10 which may put me up one on this catch up race I got going here. 

One piece of good news, I completed number 2 which was never selected, but was for an aunt in California, so that gives me time to catch up on one of the other ones.  I also completed #10 which is for another family member.  That one took 4 days.  Will post on that one next......

So happy sewing to everyone out there.


THE TWENTY EIGHTEEN



PROJECT
STATUS BEFORE
STATUS AFTER
1Pat Sloans BOM
Have about 55 to go out of 100.  Need to step it up

2Black and white squares
For my aunt.  Just quilting left on a king size quilt.  Fully completed now.
     
3Sewing BOM
Am currently 2 blocks behind but doing very well on this challenge

4Quilt Doddle BOM
Currently caught up with all the months except for the new one that came out yesterday.

5Bird Runner
Have all material but not cut

6 Green Wool flowers
All put together need to quilt borders and quilt squares
7Triangles in old fashion
Got all material but thats it

8 Black & White modern
Paper pieced, have material, need to start squares.  Only have 3 squares out of 100 started.

9Table runner for Anna
Have most done, adding because its too small, then need to quilt it.

10Monas quilt
All material there.  Flowers, purple and green with butterflies on it.

11aMissouri quilt
Have Cake material, need to complete rest.  It's the choice for June

 l2  Barn door to complete
One done. Other pieces all over need to put together

AllPeopleQuilt.com/resolution

Sunday, May 27, 2018

Catch up Saturday

As school starts to come to a close, with so much to do, my craving to sew gets stronger and stronger, a craving that has to be satisfied.  Because I've been so busy, I have gotten behind on some of my BOMs.  Friday was all about going through applications for students who have applied for scholarships, That took from 3:00 till 6:15.  But it's done.  Not including the the three hours of review before the meeting.  That left me exhausted on Friday night, and no time for sewing.

This Saturday was my catch up day.  I went out with a friend, had a great day around Fort Langley.  It's north of Langley, right by the Fraser River (which by the way is now receding, thank goodness.).

There was a fort at one time (there is still a walk to the area) but they moved it in the town, and you can pay to enter it, it's huge.  It shows realistically what living in the fort was like.  It's well worth the trip for that alone.  But there is so much more to do, including tons of antiques at a warehouse right in town.  Check it out.  I was there from 11:30 - 3:30, and so busy, you need two days to see it all.

Here are some shots that show you the CN station you can walk through as well as the main town.

They do a lot of filming in this area for small town shots.

Back to my catch up day.

When I got home, my husband had done almost all of our cooking.  I just had one more thing to do.  Then he made me a hamburger.  It was wonderful.  We sat, had a few drinks, and then my husband went to listen to music, which I stated to sew.  Here are the results of that sewing.

Sewology BOM.  Two more completed, but I am still one behind.  Can you tell what they are?
Needle and cutter.  There are some mistakes with the cutter, but so many pieces, it was scary.
Ruler.
The Quilt Doogle BOM.   All caught up.

The very last one, snowman and his dog.  I got buttons for the carrot noses.

And then to really go forward, I made the next three pieced blocks so all I need is to do the applique.  As usual, Quilt Doodles's Snow Much Fun Block of the Month is so much fun, join us.  You can get the patterns on Cratsy, or Etsy (yes you have to pay, but it's minimal).  

The final quilt will look like the picture below.  It's a scrappy look, which you can make scrappy.  All pieces are cut out ahead of time and each month you do the applique.  It's not hard, it's rather fun, and I use my button stitch on the machine to attach the applique.  Three more to go, and then the borders.  I'm very excited to see the final, and to add all my buttons to all the appliques, making it unique.

Well, that was it, that seems like enough.  I have more to do (one more Sewology) and I need to catch up on my other 2nd Quarter listings.  Have a great sewing week.

Tuesday, April 3, 2018

Second Quarterly 2018 Finish A Long

I was so happy with last quarter's list and getting so much quilting done in the last two weeks that I only have to finish up a couple and they're done.  I had put four items on the list that I almost completed but having two completed, and two baby quilts completed made me satisfied.  (See here for the blog entry).

So what next?  Once more there is a list to complete, and I'm hoping to to get at least five done this time.  One of them is urgent (a quilt for my Aunt who is going into the hospital April 12th.   So it needs to be completed right away.  Also I have two that were on the list last quarter that are almost done, so it will be easy to complete them right away.  OK, here's the list:

(1)  The Midnight Garden.  It's all completed and I have to quilt it now.  All the wool is completed.  The two and a half inch squares are sewn all around the wool.  It's really very beautiful.  Here's what it looks like now:

(2)  The pixelated eye - which is a Craftsy free course online with Caro Sheridan.  I have the kit and I would like to complete it so I can exchange the pixelated quilt that is hanging right now (a pixelated sunflower I made after this course) can be changed.


(3)  Want to make the 2nd door for the quilted barn door that I have started for my entrance way to my sewing room.  Here is one done.  I need to make the next panel.  I already quilted one with leaf pattern on the leaves, and a spiral pattern all around the leaves.  Doesn't it look great?  The pattern is from Jennny Pedigo and Helen Robinson for Sew Kind of Wonderful.  It's from a book called One Wonderful Curve. It's a fantastic book with beautiful patterns, all quilts have curves.  I have trouble with making Duncan curves.  But using the ruler  from Sew Kind of Wonderful makes making curves simple and easy, with a simple curve that doesn't need pinning.  Check out the ruler and some free patterns at Sew Kind of Wonderful.

So number three is to make a second quilt like the picture shown for the 2nd barn door to cover the entrance way in the picture. 

(4)  I want to complete some Row-by-rows that I've been collecting for the last two years.  At one point I had 110 of them.  I've slowly but surely been going through some (I've done over 20) and I want to set a goal of four of them in this quarter of time.  I am hoping that in December I will have enough to make a queen/king size quilt for my bed.  I am also working at Quilting-as-you-go style for these rows.  What four do I want to do?  Any that catch my eye.  I do have over 90 to choose from.  :)

(5)  Another goal for this quarter is to do another quilt kit that I purchased.  It has old style quilting material that is made of diamonds.  You use 2 1/2 inch strips.  Perfect to make a fast quilt.


(6)  Flamingo Quilt by Elizabeth Hartman - I have been gathering up the pink material to complete the quilt.  The pattern is wonderful.  Here's someone else's quilt already done up.  I am starting from scratch - nothing is cut.

(6)  Deer Course on Craftsy - Under the same idea - Patch work Piecing:  Woodland Animals is a Craftsy course by Elizabeth Hartman.  I just love the deer that she makes for this one.  I want to make a pillow of it, or a smaller quilt.  See her example online.  If not the deer then the bear for a child's quilt.


(7)  Then there is another one that is partly complete.  It's the 100 blocks that Pat Sloan was working on last year with a number of her friends.  I have about 40 completed, and I want to set a goal of doing another 10 blocks, and starting to put them together in shadow boxes.  I want to Quilt as you go rows by rows so I can do some great quiltings.

(8)  I have set a goal to keep up with the Sewology BOM that I am part of.  It's a wonderful quilt pattern by Pen and Paper Patterns on Craftsy.  See below for a picture of the entire quilt.  I am at the part of the needle and the cutter block and then the ruler block.  So two behind.  But all others are completed, and they are all sewing together.  I do have the iron completed, but not with the others.  By the end of the block I expect the scissors and the stitch block as well to be completed.  I'm excited about this quilt.  It's for me alone, and it will be big enough for a full size bed. 
(9)  You and Me Quilt by Tres Chic.  It is taking forever to complete this quilt.  It's for my Aunt in California.  She is getting her operation April 12th, and I would like to send it to her before that day.  The entire quilt is being done in squares about an inch in diameter.  That is taking so much time.  I'm trying to do at least 4 blocks a month but I'm behind and now I really have to step it up.  As you can see the quilt is king size, and all in blacks and white.  So far I can honestly say I am about half way through it, so I am very excited to complete the entire thing.
Thinking this is enough?  Noooooooo.  There's more, and some urgent.

(10)  A table cloth for a friend of mine made by Northcott Fabric, their artisian line.  See a picture of the centre panel.  All I need is to quilt it now.

(11)  A panel of a heron, that's from Artisian Fabric  Absolutely gorgeous.  Just doing it as a panel for a table top.

12) Finish the Craftsy Quilting Class Quilt.  Two blocks done only.  But take a look at the quilting....

WOW

13)  Finish my applique and put it into a Redwood Quilt (quilt that is completely made up of red material.  Got a lot to finish here.

 14)  I joined a class for making a quilt called "In Full Bloom".  It's making a flower out of coloured fabric.

15)  I have material for a pink top and the pattern.  Short sleeve, cotton top.  Want to complete it before July.

16)  I also have pink material for a jumper dress that is perfect for this silk/polyester material that has a lot of embroidery.  

17)  The final sewing project I have is with a small knit top and shorts set for the summer.

OK, that's enough.  I'm sure there are a number of quilts here that I will enjoy starting.  Plenty of work and I'm sure I'll be able to complete at least 5 out of this list.

JUST WATCH ME  :)


Another completion..... Missouri Star.

 It's the colassal Churn Dash from Missouri Star. The video to help you is here.  It's three different churn dashes for you to do.  ...

Popular Posts